PHYSICAL/FINANCIAL PROGRESS OF IMPROVEMENT OF ROADS IN JAMMU CITY ENDING 01/2010

S.No

Name of Work/

Constituency

Effective

Total Length

Estimated

Proposed Physical Targets

Funds

Expenditure

Physical Achievemets ending 01/2010

REMARKS

 

Length

in terms of

Cost

50MM thick

25mm thick S.D

Drain

Footpath

Released

Ending 

25mm thick S.D

Drain

Footpath

 

12'-0" width

Macadam

Renewal Coat

2009-10

01/2010

Renewal Coat

Rm

Rm

in Kms

in Kms

in Lacs

Km

Km

Rmt

Rmt

in Kms

GANDHI NAGAR 

1

a) Roads in A,B,C,D Block in Gandhi Nagar

11.82

71.75

932.75

14.34

71.75

-

500

932.75

59.30

b) Pawan Chowk to Balmiki Chowk 

3.10

c) Trikuta Nagar roads

3.00

671.34

17.68

 

d) Bikram Chowk to Jorawar Singh Chowk to Railway Station

2.60

16.71

-

Centrel verge 700mtr.

Work in progress

e) Ambedkar Chowk to Narwal Chowk

2.00

0.90

f) Old Octroi Post to Railway Station

0.70

3.83

2

Road from Bahu Rotary to NH IA

1.30

5.34

68.11

1.06

5.34

-

-

68.11

68.11

1.91

100

Imptt. of Berms 3.50Km

Work in progress

3

Roads in Bhathindi

3.50

7.19

141.11

2.83

7.19

500

-

141.11

102.72

10.55

1320

-

Work alloted

4

Roads in Subjwan

3.50

7.19

70.10

-

7.19

-

-

70.10

56.53

-

1310

-

Work alloted

5

Roads in Greater Kailash Colony

7.00

14.38

213.98

4.87

14.38

-

-

213.98

270.92

-

500

-

Work alloted

6

Road in Sainik Colony

7.00

14.38

140.20

-

14.38

-

-

140.20

18.35

1000

-

Work in progress

7

Road from Bahu Rotary to Bahu Fort Temple

1.20

2.46

31.40

0.49

2.46

-

-

31.40

31.30

4.10

1500

-

Work alloted

8

Roads in Digiana 

3.00

6.16

60.06

-

6.16

-

-

60.06

116.84

7.27

1900

Strengthening of berms of way of SH, MT 6.00Km

Work in progress

9

Roads in Shastri Nagar

3.50

7.19

106.91

2.43

7.19

-

-

106.91

6.24

10

Roads in Bhathindi including Kargil Colony

7.00

7.00

68.25

-

7.00

-

-

68.25

102.77

-

500

Imptt. Of berms by way of cutting & filling 6.00Km

Work in progress

11

Roads in Sunjwan, Vidata Nagar

6.00

6.00

63.50

-

6.00

500

-

63.50

12

Rani Bagh Peer Baba road

0.75

3.07

69.23

0.614

3.07

1500

1500

69.23

48.96

4.70

-

-

1Km Double Lane 0.75Km 4 Lane (av. Width 12.50Mtr.) BT = 17200Sqm. Tender floated for allied works

13

Raipur Satwari Makwal road upto Nikki Tawi

4.50

3.70

62.28

0.74

3.70

1500

-

62.28

33.00

4.49

-

-

Carriage width 6mt. Average. BT=16400.00Sqm.

14

Bikram Chowk to Satwari Airport

4.60

21.00

375.00

10.00

21.00

-

-

375.00

100.00

33.40

-

 Box type culvert 1.5Mtr. Span

BT = 12600.00Sqm.

15

Channi Rama and inner links of Channi Himmat, Sainik Colony, Trikuta Nagar

8.00

8.00

128.00

1.00

8.00

-

-

128.00

31.95

28.00

2000

Imptt. Of berms by way of cutting & filling 9.00Km

Work in progress

16

Bandu Rakh and allied links

4.00

4.00

50.00

-

4.00

-

-

50.00

19.82

-

-

Imptt. Of berms by way of SH & MT =500mtrs.

Work in progress

17

Internal roads in Ganyal Ekta Vihar, Kanjwani and Shanti Nagar

0.00

-

125.00

-

-

-

-

125.00

4.84

2.00

2000

-

-

TOTAL:-

88.07

188.81

2705.88

38.37

188.81

4000

2000

2705.88

1718.40

160.13

12130.00

0.00

JAMMU WEST

1

B.C. road.

1.85

8.00

105.24

1.60

8.00

100

100

105.24

94.46

12.00

-

-

i) Bitumenous Macadum =205 Cum completed ii) Semi dense Bitumenous concrete =829Km completed

2

Janipur Ambgrota road.

7.00

24.00

376.72

4.80

24.00

5000

1000

376.72

263.41

27.00

36

800

Work in progress

S.No

Name of Work

Effective

Total Length

Estimated

Proposed Physical Targets

Funds

Expenditure

Physical Achievemets ending 01/2010

REMARKS

 

 

Length

in terms of

Cost

50MM thick

25mm thick S.D

Drain

Footpath

Released

Ending 

25mm thick S.D

Drain

Footpath

 

 

 

 

12'-0" width

 

Macadam

Renewal Coat

 

 

2009-10

01/2010

Renewal Coat

Rm

Rm

 

 

 

in Kms

in Kms

in Lacs

Km

Km

Rmt

Rmt

 

 

in Kms

 

 

 

3

Mian Deedo Chowk to CPO Chowk via Ambphalla

0.80

3.50

54.72

0.70

3.50

200

400

54.72

48.07

3.50

-

400

Work completed

4

Kacchi Chowni to Rehari Chungi (Exchange road)

0.80

2.40

38.67

0.48

2.40

300

250

38.67

33.97

2.40

-

-

work completed

5

Rehari Chungi to Patoli via Sarwal

2.00

7.50

105.84

1.50

7.50

1000

 -

105.84

83.97

-

627

-

Work in progress

6

Rehari Chungi to Rehari Colony

0.90

3.10

43.61

0.62

5.00

400

 -

43.61

38.30

5.00

-

-

Work completed

7

Rehari Colony to AG office chowk via Rajpura

2.00

4.50

64.50

0.90

4.50

700

 -

64.50

56.66

3.00

-

-

Work in progress

8

Rehari Colony to Toph Chowk via Subash Nagar

1.20

3.42

57.17

0.68

3.42

500

500

57.17

50.21

3.40

-

-

Work in progress

9

Toph Bridge to Patoli Chowk

1.20

3.37

49.15

0.68

3.39

600

 -

49.15

38.67

4.50

400

-

Work completed

10

Ambphalla Chowk to B.C. road via Ved Mandir

0.45

1.35

21.35

0.27

1.35

400

 -

21.35

18.74

1.35

400

 

Work completed

11

Rehari Colony Chowk to Bakshi Nagar morh via Baby Caterers

0.70

1.89

29.17

0.38

1.89

500

 -

29.17

25.61

9.00

-

-

Work completed & area exceeded due to requirement of Hon'ble MLA Jammu West

12

Talab Tillo Bohri road from Canal Head to Patta Chowk

3.20

6.57

120.93

1.31

6.57

1000

1500

120.93

102.20

8.91

-

-

Carriage way width 10.5Mt. Average BT = 22072.00Sqm. Work allotted for allied works.

13

Canal Head to Bhagwati Nagar upto Yatri Niwas

1.90

3.89

92.73

0.78

3.89

1300

1500

92.73

86.10

5.60

-

-

BT = 10900Sqm. 

14

Janipur Colony internal road.

3.00

6.30

85.50

1.26

6.30

500

 -

85.50

57.02

11.50

450

-

Work in progress

15

Pamposh Colony internal roads.

4.00

2.70

36.50

0.54

2.70

200

 -

36.50

32.07

4.50

100

-

Work in progress

16

Daily Excelisor road Janipur.

3.00

1.80

28.00

0.36

1.80

500

 -

28.00

24.60

1.80

-

-

Work in progress

17

Maheshpura Chowk to Mini Bus Stand via Principal Medical College Residence

0.65

1.75

24.36

0.35

1.75

200

 -

24.36

21.40

1.75

45

-

Work completed

18

Ambphalla to B.C. road via Goushalla

0.44

0.95

16.13

0.19

0.95

400

 -

16.13

14.17

1.00

225

-

Work completed

19

Estate Qtr. Subash Nagar to Canal road via Shanti Nagar

1.25

2.63

35.66

0.53

2.63

200

 -

35.66

31.32

2.00

-

-

Work in progress

20

Internal roads of Gurah Bakshi Nagar

1.50

14.00

156.50

-

14.00

2000

-

156.50

107.38

5.00

-

-

Work in progress

21

Kabir Nagar Colony road

1.10

0.90

16.49

0.18

0.90

500

-

16.49

16.10

1.55

225

-

Carriage way width 4mt. Average BT=1460.00Sqm.

22

Pencil Factory road to meet Talab Tillo Bohri

1.00

1.23

20.77

0.25

1.23

500

-

20.77

17.50

0.93

-

-

Carriage way width 3.6mt. Average BT=3403.00Sqm. Tender floated for allied works

23

Internal roads of Karan Nagar.

-

-

20.00

-

-

-

-

20.00

-

-

-

-

-

24

Internal roads of New Rehari Colony incl. main road from Shakuntla.

-

-

15.00

-

-

-

-

15.00

-

-

-

-

-

S.No

Name of Work

Effective

Total Length

Estimated

Proposed Physical Targets

Funds

Expenditure

Physical Achievemets ending 01/2010

REMARKS

 

 

Length

in terms of

Cost

50MM thick

25mm thick S.D

Drain

Footpath

Released

Ending 

25mm thick S.D

Drain

Footpath

 

 

 

 

12'-0" width

 

Macadam

Renewal Coat

 

 

2009-10

01/2010

Renewal Coat

Rm

Rm

 

 

 

in Kms

in Kms

in Lacs

Km

Km

Rmt

Rmt

 

 

in Kms

 

 

 

25

Bakshi Nagar Canal Bridge to Tope Bridge via Shamshan Ghat.

-

-

18.00

-

-

-

-

18.00

-

-

-

-

-

26

Link road to Shakti Nagar.

-

-

5.00

-

-

-

-

5.00

-

-

-

-

-

27

Internal roads of Resham Ghar Colony

-

-

9.50

-

-

-

-

9.50

-

-

-

-

-

28

Road from Shiv Nagar to Subash Nagar

-

-

9.50

-

-

-

-

9.50

-

-

-

-

-

29

Internal roads in Talab Tillo

-

-

70.00

-

-

-

-

70.00

-

-

-

-

-

30

Talab Tillo Gho Manahasan road upto Gole Gujral

4.00

5.47

129.84

1.09

5.47

2000

2000

129.84

60.00

4.07

-

-

Carriage way width 6.00Mt. Average BT = 8297.480Sqm. Tender floated for allied works.

31

Internal roads of SMGS Hospital/Development of Parking Place.

-

-

40.00

-

-

-

-

40.00

-

-

-

-

-

 

TOTAL:-

43.94

111.22

1896.55

19.45

113.14

19000

7250

1896.55

1321.93

119.76

2508.00

1200.00

 

 

JAMMU EAST

 

 

 

 

 

 

 

 

 

 

 

 

 

1

Palace road from Panjthirthi to Rameshwar temple

1.35

6.25

83.86

1.25

6.25

100

150

83.86

69.16

7.25

-

-

Work completed

2

Rameshwar Chowk to Indira Chowk

0.50

3.30

44.67

0.66

3.30

50

100

44.67

39.24

3.30

-

-

work completed

3

Indira Chowk to J.P. Chowk

0.60

2.88

39.71

0.57

2.88

 -

150

39.71

34.88

2.88

-

100

work completed

4

J.P. Chowk to Dogra Chowk (Vinayak Bazar)

0.35

1.68

30.53

0.34

1.68

300

300

30.53

26.81

-

-

-

Work alloted but not taken up.

5

V.N. Chowk to Dogra Chowk (JDA road)

0.65

4.68

63.37

0.94

4.68

150

100

63.37

55.67

5.00

-

-

Work in progress

6

Gurudwara Sunder Singh road

0.23

1.35

17.25

0.27

1.35

 -

 -

17.25

15.15

1.35

-

-

Work completed

7

CM's residence to D.C. Office

0.33

0.73

10.38

0.15

0.73

100

 -

10.38

9.12

0.73

-

-

work completed

8

CM's Residence to Raghunath Bazar Residency Road

0.73

3.28

51.82

0.65

3.28

200

400

51.82

45.52

4.70

-

-

Work in progress

9

Panjthirthi to Sidhra Bridge (Ext. to Circular road)

2.75

6.00

80.68

1.20

6.00

400

 -

80.68

70.87

6.65

100

-

Work completed

10

Main Bakshi Nagar road

1.64

7.36

107.03

1.47

7.36

300

500

107.03

94.01

6.10

-

-

Work in progress

11

Jewel Canal road

0.78

4.40

76.23

0.88

4.40

400

800

76.23

66.96

4.70

-

-

Work completed

12

City Chowk to Shaheedi Chowk

0.47

1.39

26.79

0.28

1.39

300

300

26.79

23.53

2.00

-

-

Carpet laid as per orders of Dy. CM 

13

Hari Market road

0.40

1.44

21.43

0.29

1.44

300

 -

21.43

18.82

1.44

-

-

Work completed

14

Lala Hans Raj Park road

0.45

0.88

12.15

0.17

0.88

100

 -

12.15

10.67

0.88

-

-

Work completed

15

Circular road

4.50

7.13

96.17

1.43

7.13

500

 -

96.17

75.47

5.80

-

-

Work in progress

16

Jewel Chowk to Vinayak Bazar

0.12

0.54

8.77

0.10

0.54

200

 -

8.77

7.70

-

-

-

Work alloted but not taken up.

17

Raghunath Temple to City Chowk

0.30

0.99

15.52

0.19

0.99

200

100

15.52

13.64

0.99

 

 

Work completed

18

Road from Slaughter House to meet Exchange road

0.53

1.19

17.23

0.24

1.19

200

 -

17.23

15.14

1.19

-

-

Work completed

19

Road from Shakuntla Crossing to Exchange bridge via Div. store.

0.60

1.26

18.06

0.25

1.26

200

 -

18.06

15.87

-

130

-

Work completed

20

Idd Gah road

0.33

0.95

14.07

0.19

0.95

200

 -

14.07

12.36

1.10

70

-

Work completed

21

Panjbakhtar road

0.22

0.45

7.75

0.09

0.45

200

 -

7.75

6.81

0.50

30

-

Work in progress

S.No

Name of Work

Effective

Total Length

Estimated

Proposed Physical Targets

Funds

Expenditure

Physical Achievemets ending 01/2010

REMARKS

 

 

Length

in terms of

Cost

50MM thick

25mm thick S.D

Drain

Footpath

Released

Ending 

25mm thick S.D

Drain

Footpath

 

12'-0" width

Macadam

Renewal Coat

2009-10

01/2010

Renewal Coat

Rm

Rm

in Kms

in Kms

in Lacs

Km

Km

Rmt

Rmt

in Kms

22

Forest road

0.23

0.54

9.93

0.11

0.54

300

 -

9.93

8.73

0.50

300

-

Work completed

23

Library Chowk to Ranbeshwar Temple via Prade including link road to Fly over.

-

-

10.00

-

-

-

-

10.00

-

-

-

-

-

24

Shahidi Chowk to D.P.S.School

-

-

9.00

-

-

-

-

9.00

-

-

-

-

-

25

Internal roads of Talab Khatikian.

-

-

10.00

-

-

-

-

10.00

-

-

-

-

-

26

Link road to Karbla Colony.

-

-

3.40

-

-

-

-

3.40

-

-

-

-

-

27

Kachi Chowni to Police Post via Dewan Mandir.

-

-

4.00

-

-

-

-

4.00

-

-

-

-

-

 

TOTAL:-

18.06

58.67

889.80

11.72

58.67

4700

2900

889.80

736.13

57.06

630.00

100.00

 

 

RAIPUR DOMANA

 

 

 

 

 

 

 

 

 

 

 

1

Matador Route Muthi and Muthi village, Vinayak Nagar Sec-I H.N0 217 to 222 and Bhallissi Colony

4.00

3.00

44.50

0.54

2.70

1200

 -

44.50

39.10

4.00

700

-

Work in progress

2

Durga Nagar and Suryavanshi Nagar roads.

10.00

7.00

94.46

1.40

7.00

500

 -

94.46

73.97

5.00

100

-

Work alloted

3

Roop Nagar enclave and adjoining roads.

6.00

3.60

52.00

0.72

3.60

600

 -

52.00

45.68

3.00

200

-

Work in progress

4

Bantalab Barnai road

3.00

2.70

54.50

0.54

2.70

2000

 -

54.50

47.88

2.70

1500

 

Work in progress

5

Bharat Nagar and allied roads

4.00

3.00

47.19

0.60

3.00

300

 -

47.19

27.06

4.90

800

-

Carriageway width 3mt. Average BT=5150.00Sqm.

6

Link road Akhnoor road to Durga Nagar

0.63

0.52

8.64

0.104

0.52

200

-

8.64

6.80

0.73

130

-

Carriage width 3mt. Average. Work allotted.

7

Roads in Shantipuram, Dogra Nagar and Lower Muthi roads adjoining Durga Nagar roads including Sharika Vihar Lower Roop Nagar 

4.00

6.58

45.35

-

10.51

2000

-

45.35

27.00

6.50

400

-

Work in progress

8

Road to Vinayak Colony near Soap Factory Paloura

2.00

3.50

20.00

-

-

500

-

20.00

16.25

-

200

-

220mtr. Road completed upto MT

9

Roads in Chinore,Lakshipuram, Gujjar Mohalla, Harijan Mohalla and adjoining lanes.

-

-

20.00

-

-

-

-

20.00

-

-

-

-

-

10

Roads in upper Dhok Paloura.

-

-

29.13

-

-

-

-

29.13

-

-

-

-

-

11

Toph Bridge to Jaggi Darbar via Paloura village

-

-

22.00

-

-

-

-

22.00

-

-

-

-

-

12

High Court road, Hidayat Pura, Lakkad Mandi, Kheer bhawani, Nasib Nagar, Gujjar Basti, Upper Paloura, Keran link road and Basant Nagar link.

-

-

50.00

-

-

-

-

50.00

-

-

-

-

-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL:-

33.63

29.90

487.77

3.90

30.03

7300.00

0.00

487.77

283.74

26.83

4030.00

0.00

 

 

NAGROTA

 

 

 

 

 

 

 

 

 

 

 

 

 

1

Roads in Sidhra Colony Assararabad Colony

2.00

3.50

20.00

-

3.50

500

-

20.00

13.50

3.50

500

-

Work in progress

 

TOTAL:-

2.00

3.50

20.00

0.00

3.50

500.00

0.00

20.00

13.50

3.50

500.00

0.00

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G.   TOTAL:-

185.70

392.10

6000.00

73.45

394.15

35500.00

12150.00

6000.00

4073.70

367.28

19798.00

1300.00

 


 