Identification of Roads & Bridges Proposed under ADB Loan - III

.No

Name of the Scheme

Length/ Span

Cost

Scope

1

2

3

4

5

DISTRICT RAJOURI

1

Impvtt./Upgd. of Darhal Thanna Mandi road.

20.00

30.40

Upgd. from Single lane FW to Double lane BT specification

TOTAL

20.00

30.40

 

DISTRICT POONCH

1

Impvtt./Upgd of Suran Mendhar road.

21.00

32.76

Impvtt/ Upgd Single lane to Double lane.

TOTAL

21,00

32.76

 

DISTRIC REASI

1

Impvtt/Upgd. of road from Kanda to Kotla via Ransoo (link to Shiv Khori Shrine)

18.00

25.80

Impvtt/ Upgd Single lane to Double lane.

2

Const of road from Dhamni to Gulabgarh via Dewal

25.00

25.70

New Connectivity to far-flung - Backward area of GulabGarh

3

Impvtt./Widening of Panthal Jhajjar road

12.25

14.46

Impvtt/ Upgd Single lane to Double lane incl. const of 28 Mtr bridge and 45 CD works

4

Const, of road from Tuli Bana to Arnas

80.50

110.00

New Construction Single lane.

TOTAL

135.75

175.96

 

DISTRICT UDHAMPUR

1

Impvtt/Updg. Of Trilla- Barotu Dalsar road

20.00

35.00

Impvtt. Of REW road to Double lane.

2

Impvtt/Upgd. of Ramnagar- Dudu Basantgarh road upto Latti

94.00

200.00

Impvtt/Upgd. incl. 1 major bridge

3

Impvtt/Upgd of road from Jib Morh to Bansa Morh via Jib Thathi

20.00

30.00

Impvtt/Upgd. incl. 2 major bridge

4

Const of road from Sudh Maha Dev to Banhan.

26.00

104.00

Proposed road to take off from Km 25th of Chennani Sudh Maha Dev road (under ADB) crossing Dudhira Top to Banhan in Udhampur District & linking Khellani Goha road

TOTAL

160.00      

369.00

 

..No

Name of the Scheme

Length/ Span

Cost

Scope

1

2

3

4

5

DODA DISTRICT

1

Extn. Of Khellani Goha road upto Marmat (Banhan) an alternate road to Doda from Sudh Maha Dev

24.00

71.00

New construction upto village Roat (Banhan)ultimately connecting Sudh Maha Dev (an alternate route to District Doda).

2

Impvtt/Updg. Of Khellani Goha road

26.50

35.00

Impvtt/ Upgd Single lane to Double lane.

3

Const of road from Chattergala to Kailash Kund via Seoi Dhar

32.00

44.00

New Construction proposed to take off at Km 28th of Basohli-Bani-Bhaderwah road near

TOTAL

82.50        150.00

KISHTWAR DISTRICT

1

Const of road from Patimahal to Dachhan (Marwah)

30.00

90.88

New connectivity to farflung area

2

Upgd. of Margan Top inshan road

25.00

35.00

Impvtt/Upgd to Single lane BT Specification

TOTAL

55.00

125.88

 

G.TOTAL

628.08

1562.39

 